Utility Commercial Utility Permit UID# 206 App. Status: Canceled Valid: 10/21/2014 - 10/31/2014Morrison County Public Works 213 - 1st Avenue SE Little Falls, MN 56345
Information
Aerial or Underground?
Underground
Construction Description:
County Road 242 intersecting with 330th Ave
Construction Dates:
10/21/2014to10/31/2014
Work Order:
Location
Map:
Location Description:
Site(s):
Road
Length
From
To
Shortest distance from centerline
Relative to Road
242
0 mi 1584 ft
330th Ave
south 1/4 mile
32 ft
Under Road
32
0 mi 1584 ft
39916
40142
32 ft
North
Road Number(s):
242,32
Aerial
Aerial type:
Voltage:
Conductors:
Conductor size:
Minimum height along road:
Minimum height at crossings over road:
Underground
Underground type:
Conduit/casing type:
Method of installation:
Conductors:
Conductor size:
Trench Width:
Depth:
Voltage:
Sketch / Site Plan
Upload sketch:
Applicant
Applicant name:
Name:
Ted . Kasper
Company name:
Benton Co-op Telephone Co
Phone:
(320
) 393
- 2115
Additional Email Notification:
tkasper@jetup.net
Company address:
2220 125th St NW
Rice
MN
56367
Contractor
Contractor name:
Utility Company
Owner of Utility:
Invoice #883 (10/21/2014)
Charge
Cost
Quantity
Total
Non-Taxable
Subtotal
$0.000
Grand Total
Total
$0.00
Due
$0.00